Hazard products

How deep, how often, how likely: for each site you finance or insure.

Four hazard families, water, fire, geotechnical and extreme temperatures, delivered as hazard curves and return periods at the coordinates of every site, with the drivers behind each number broken out.

4 hazard families flood 1:100 PGA 1:475
HazardsWaterGrain store, Kisumu published · reviewed
Flood depth at 1-in-100 years
1.1 m · central
range 0.8–1.4 m
class: high
0.5 m1.0 m1.5 m2.0 m1-in-100 · 1.1 m2101001000return period, years
src2D flood · DTM · FABDEMIllustrative
Four hazard families

One catalogue of hazards, read the same way at every site.

Each hazard is published as a value, a class and a source. Classes follow published bands rather than our own scale, so a “high” flood or landslide class means the same thing to your engineers, your underwriters and your regulator.

Water

Rainfall return periods, flood depth at 1-in-100 years, 2D flood modelling on bare-earth terrain and dam-release surge downstream of reservoirs.

return periods1:100 depthdam release
Water hazards

Fire

A fire risk score for each site and month, showing where the fire season sits and how often it reaches the high classes.

fire risk scoremonthly
Fire hazard

Geotechnical

Landslide susceptibility on terrain, and seismic peak ground acceleration with a 1-in-475 year return period, the design level used in building codes.

landslidePGA 1:475
Geotechnical hazards

Extreme temperatures

Heat percentiles for daily maximum temperature and comfort indices, humidex among them, for the sites where people work and live.

p90 · p95 · p99humidex
Temperature hazards
01 · Water

Flood modelled on the ground, not on the rooftops.

  • Rainfall return periods1:2 to 1:1000

    How much rain falls in the storm you should expect once in 10, 100 or 1,000 years at the site.

  • Flood depth, 1-in-100 yearsmetres

    Water depth at the site in the 1-in-100 year event, with a range and a published class.

  • 2D flood modelling on terrainbare-earth DTM

    Water routed across a bare-earth terrain model. Runs start automatically when a new DTM is published for the area.

  • Dam-release surgedownstream

    The surge reaching sites downstream when a reservoir releases water in an extreme inflow.

Terrain follows a fixed priority: LiDAR, then our own pipeline, then FABDEM, then Copernicus DSM. About terrain and the site atlas.

24-hour rainfall by return period, Kisumu
142 mm · 1-in-100
range 118–171 mm
class: high
Return periodCentralRangeClass
1-in-10 years88 mm79–98Low
1-in-25 years107 mm94–121Moderate
1-in-50 years124 mm106–144Moderate
1-in-100 years142 mm118–171High
1-in-1000 years205 mm158–262High
srcERA5 · return periodsIllustrative
02 · Fire

When the fire season arrives, and how severe it gets.

  • Fire risk score0–100

    A single score per site and month, with the class it falls in, so fire exposure can be compared across a whole portfolio.

  • Season profile12 months

    Which months reach the high classes, so plantation, forestry and estate exposures can be timed against the season.

The fire season is also one of the physical shocks in stress testing.

Fire risk score by month, timber estate, Mpumalanga
78 · August, high
5 months ≥ 60
class: high
255075JFMAMJJASONDhigh≥ 60
srcfire risk score · ERA5Illustrative
03 · Geotechnical

Slopes that move and ground that shakes.

  • Landslide susceptibility5 classes

    Computed on bare-earth terrain, in classes that follow published bands. Landslide runs start when a new DTM is published.

  • Seismic peak ground acceleration1-in-475 years

    PGA in g at the 1-in-475 year return period, the same level structural design codes use, along the Rift and the Maghreb.

Geotechnical hazard, five sites in one portfolio
0.24 g · highest PGA
1-in-475 years
published bands
SiteLandslidePGA (g)Seismic class
Tea factory, KerichoHigh0.14Moderate
Hydro intake, RwenzoriVery high0.24High
Warehouse, Addis AbabaLow0.18Moderate
Hotel, AgadirLow0.21High
Data centre, LagosLow0.03Low
srcDTM · PGA 1:475Illustrative
04 · Extreme temperatures

The hottest days at a site, and how they feel.

  • Heat percentilesp50 · p90 · p95 · p99

    The distribution of daily maximum temperature, so cooling loads, equipment limits and crop thresholds can be read directly.

  • Comfort and humidexdiscomfort days

    Temperature and humidity combined into how heat feels, counting the days of heat discomfort that drive productivity and energy demand.

Carried forward to 2030, 2050 and 2090 under SSP scenarios in climate projections.

Daily maximum temperature percentiles, packhouse, Upington
41.5 °C · p99 in 2050
today → 2050
SSP2-4.5 · p50
30°34°38°42°p5032.6p9037.4p9538.9p9941.5
srcERA5 · CMIP6Illustrative
Hazard curves and disaggregation

A full curve per site, and the reasons behind it.

A single 1-in-100 number hides most of what an underwriter or engineer needs. Every site carries the whole curve from frequent to rare events, and a disaggregation that shows which drivers make up the hazard.

Hazard curve

Intensity against return period, from 1-in-2 to 1-in-1000 years, with a range at each point. Read off the level that matches your own risk appetite rather than ours.

Disaggregation

The share of the hazard coming from each source: river or surface water, a nearby dam, a particular fault, so mitigation can target the cause.

Published classes

Every value is assigned a class from published bands. Classes are shown in words as well as colour, in the console, files and API.

Flood disaggregation at 1-in-100 years, grain store, Kisumu Illustrative
DriverShare of depthDepth contributionWhat it suggests
River overflow58%0.64 mRaised floor levels and flood barriers on the river side
Surface water (pluvial)27%0.30 mOn-site drainage and storage capacity
Dam-release surge15%0.16 mEngagement with the upstream operator on release warnings
What you can do with it

Questions underwriters, lenders and engineers ask.

Hazard products answer the site-level questions: is this place exposed, to what, and how badly in a rare but plausible event.

  1. Which insured sites would sit under more than half a metre of water in a 1-in-100 year flood?

    Filter the portfolio on flood depth and class, and export the list with ranges.

    flood depth · 1:100 · class
  2. Is a new project site downstream of a dam that could surge?

    Check dam-release surge and the disaggregation before credit approval, not after construction.

    dam release · disaggregation
  3. What return period does our reinsurance attachment correspond to at each location?

    Read the full hazard curve per site and compare it with your own attachment point.

    hazard curve · per site
  4. Which of our assets sit on slopes in a high landslide class or in high seismic zones?

    Combine landslide susceptibility and PGA at 1-in-475 years in one table for engineering review.

    landslide · PGA 1:475
  5. How many months a year are our forestry exposures in high fire risk?

    Read the monthly fire risk profile per estate and see how many months reach the high class.

    fire risk score · monthly
  6. How hot does it get at our cold-chain sites on the hottest one per cent of days?

    Use the p99 daily maximum and humidex at each site to check equipment and cooling limits.

    p99 · humidex
See it on your own book

Bring a sample portfolio. Leave with a stress result.

In a working session we run a sample of your counterparties through a physical shock and a transition scenario, and walk you through every step of the chain from hazard to capital.